Research 1995 - 2001

Print

1) Studies and geotechnical calculations by IPT Project Management (IPT Projektijuhtimine) in 2001 (January-April)

  1. Determination of the deformation module.
  2. Surface calculations, with recommendations for the exploitation of the landfill.
  3. Determination of the safety factor in the case of a leak of the clay screen.
  4. Determination of the safety factor in the case of a slope collapse and shear breaking.
  5. Stability calculations of foundation structure settlements.
  6. Stability calculations characterising the sliding of surface material.

2) Studies by GOLDER ASSOCIATES GMBH in 2000

     1. Three bore wells were drilled for surveying the groundwater in the northern quarry and in its proximity.

     2. The following laboratory samples were taken and analysed:

    • Groundwater
    • Surface water
    • Soil
    • Sludge
    • Surface gas

     3. Air quality was analysed according to the following parameters:

    • Precipitation
    • Dust
    • Odour
    • Noise

      4. Biological analysis of the surface water was carried out.

 

3) Valuation of the cost of the construction of Tallinn Landfill. Calculation of the construction cost of the landfill by ETP Group Ltd (1998);

4)  Drainage pipeline of Tallinn Landfill. Plan. (1998);

5) Variant solutions for a sewage system of Tallinn Landfill (1998);

6) Plan for the collection and transport of domestic waste in Harju County (1998);

7)  Observation of the possibility of vibro-thickening the open cast dumping material (1997);

8) Study of the protection screens of the storage site of the landfill (1997);

9) Geotechnical study of the accession road to the landfill and the bridges (1997);

10) Accession road to the new Tallinn Landfill (1997);

11) Geotechnical study of the exploitation possibilities of the surface strata of the northern quarry (1997);

12) Geotechnical monitoring of the northern quarry, the construction of a hydrodynamic model (1997);

13) Ecological observation of the northern quarry of Maardu (1997);

14) Analysis of the economic model designed for regulating and monitoring of the functioning of the new Tallinn Landfill (1997);

15) Environmental impact assessment of the detailed plan of the new Tallinn Landfill, endorsement of the results of the assessment and endorsement of the detailed plan by the Estonian Ministry of Environment (1997);

16) Retaining of the landfill and its access road in the ownership of the state (1997);

17) Digital survey of the route for the road connecting Harju County, Jõelähtme local municipality and Ülgase and Rebala villages in scale M 1:1000 (1997);

18) Digital survey of the area of the access road to Tallinn Landfill, supplementary construction of the plan of the plot of land (1996);

19) Geotechnical project of the intended landfill in Maardu quarry. Required studies for the design and construction of the clay screen (1996);

20) Ecological study of the intended landfill in Maardu quarry. Thermo-hydrographical monitoring from the established observation stations (1996);

21) Selection and determination of the route for the road connecting Harju County, Jõelähtme local municipality and Ülgase and Rebala villages on the basis of the borders of the plots of land of the applicants for the return of their land (1996);

22) Determination of the route for the access road to the new Tallinn Landfill in Jõelähtme local municipality on the basis of the borders of the plots of land of the applicants for the return of their land (1996);

23)  Construction of the plan of the plot of the new Tallinn Landfill in Jõelähtme local municipality, definition of the borders of the plot on the heaps of the exhausted phosphate rock quarry with area-defining geodetic survey in scale M 1:10000 (1996);

24) Geotechnical analysis and test of the intended landfill in Maardu quarry. Possibility of thickening the dump material of the quarry with heavy tamps (1996);

25) Ecological study of the intended landfill in Maardu quarry. Background study of the surface and groundwater with the measuring of the water level and determination of the hydrodynamic situation (1996);

26) Concentration of heavy metals, fluorides and sulphates in the springs of drinking water Rebala and Ülgase villages in Jõelähtme local municipality1996);

27) Detailed plan of Tallinn Landfill in Jõelähtme local municipality in Harju County by PIC Estonia Ltd (1996);

28) State environmental impact assessment of the location of the landfill, the results were endorsed by the Estonian Ministry of Environment (1995);

29) Viatek Group OY (Finland) with its Estonian partners carried out a feasibility study on the management and storage of the waste of the City of Tallinn (1995).